Registered components
From the umbrella project through demonstrations, integration gates, and research tools.
RESEARCH / TIMELINE
This timeline traces the Continuity project and Matrix ecosystem from early platform exploration through the current state. Dates are recovered from source-grounded records. Where precise dates are unavailable, the period is stated as a range.
NOVEMBER 2026
Expanded standardaf.dev from a product-focused site to represent the full scope of Standard AF: commercial products, Continuity research, the accountability demonstrator, the Matrix ecosystem, research direction, and the development journal. 22+ pages built with source-grounded content.
Self-contained HTML dashboard consuming actual demonstration records. Five scenarios, eight integrity alterations, six-level trust model. 95 self-test checks passing; five visual checks stated as unexecuted. Read-only boundary verified structurally.
Core accountability pipeline with live invocation of the accepted simulated decision council. Two provenance classes maintained without merging. 91 self-test checks.
Structured contributions, evidence correspondence, replay verification. 54 self-test checks.
Historical classification error corrected (14 source files). Successor launch mechanisms with an eight-link attributable execution chain.
A synthetic test discovered the directory guard did not bind the directory name. Rebuilt with restricted sharing so rename and removal now fail correctly.
522 cached object files removed (114 MB retired). Prior consolidation phases documented.
Three platform demonstrations documented as isolated development increments. Integration design studies recorded.
35 Obsidian notes across 9 divisions. Status dashboard established. Historical discrepancies disclosed.
OCTOBER 2026
An acceptance attempt for the native GUI stopped at missing readiness evidence. GUI acceptance remains blocked.
Five test runs produced 40+ evidence screenshots documenting the Operations Console in isolated test mode. Screenshots cover the overview, project explorer, work queue, milestone completion, diagnostics, and agent views.
Seven GUI tabs connected to real JSON-RPC bridge calls. 190 Python tests. Bridge with five methods and 41 tests. Cross-language cryptographic proof verified. Key rotation, expiry, and revocation implemented.
33 backend tests (32 passed, 1 expected skip). Bridge remains candidate-only. Serialization mismatch found between language runtimes.
Obsidian vault created with structured divisions. Matrix Lab handed off for independent integration testing.
Test-coverage questions resolved for the first Matrix Lab milestone.
Authority model approved. Further protocol publication on hold pending governance review.
Jointly ratified October 8. Independent verification: 669 of 670 tests; one fixture byte mismatch disclosed.
First layer of the second protocol primitive completed and promoted.
SEPTEMBER 2026
Four representation primitives frozen and accepted. Foundation layer for the entire protocol architecture.
Formal independent review by Dex.local. Documentary hold issued, later superseded by the September 30 completion decision.
All four primitives independently reviewed. Conflict-resolution planning for a fifth primitive initiated.
AUGUST 2026
Three successive demonstrations: local GUI with model integration, streaming and sessions, then attribution and deterministic measurements with 122 checks. All classified as isolated development, not accepted releases.
An investigation established feasibility boundaries for fine-tuning and training within the project's architecture. A pilot explored practical training workflows.
PRE-AUGUST 2026
Earlier exploratory work on the Matrix platform. Historical code later inspected with static security findings during the recovery process.
Systematic recovery and documentation of historical development artifacts. Four knowledge synchronizations progressively reconciled components. Discrepancies disclosed rather than silently corrected.
Five adapters built for vault access, document search, knowledge retrieval, provenance tracking, and code execution (disabled). First integration gate accepted; second on hold; third not authorized.
BY THE NUMBERS
From the umbrella project through demonstrations, integration gates, and research tools.
Structured knowledge across 10 divisions covering operations, lab, continuity, architecture, and evidence.
Across the accountability demonstrator (240), Matrix Lab (190+), and the Operations Console (33).
ABOUT THIS TIMELINE
Dates are recovered from file timestamps, vault notes, test result files, and build artifacts. Where the exact date is not recoverable, the period is stated. This timeline does not include protected experimental procedures, sealed research materials, or confidential implementation details.
Development journal Back to research